Description
MY/MAXIDOS1 | 1 piece
MY/FLOWREDOS | 1 refill pack
IMPORTANT NOTE: For hygiene reasons, the unused polyphosphate beads must be replaced after 12 months at the latest.
The use of polyphosphates to prevent limescale deposits is possible up to a maximum water hardness of 300 ppm CaCO3. From this level of water hardness onwards, it is recommended to install a water softener.
With the original myMAXIREDOS refill pack can be treated up to 170 m³ of water.
Use of polyphosphate beads other than the original Maychem MyMAXIREDOS polyphosphate beads will void the warranty.
2) Locate an appropriate position for dosing unit installation considering also the spaces required to remove the container for replacing the polyphosphate beads. Close the unused outlet port with the appropriate cap provided.
3) Mount the dosing unit on the cold-water supply line for hot water preparation on the boiler. It is recommended to install a shut-off valve (not included) in front of the inlet of the dosing unit.
4) Reopen the cold-water inlet tap.
5) Check the correct installation and open the shut-off valve (not included). In this way, the water flows into the container and comes into contact with the polyphosphate beads inside and allows the polyphosphate salt to be released evenly, ensuring precise dosing.